BREAKING
KVH Industries Inc (KVHI) Reports Q4 Earnings 7 hours ago Nio Inc (NIO) Beats Q4 EPS Estimates by a Wide Margin 7 hours ago Ultralife Corp (ULBI) Reports a net loss for Q4 FY25 7 hours ago Protara Therapeutics, Inc. (TARA) Reports Narrower Loss for Q4 7 hours ago Apyx Medical Corporation (APYX) Reports a Net Loss for Q4 FY25 7 hours ago Esperion Therapeutics, Inc (ESPR) Misses Q4 EPS Estimates 8 hours ago Inspired Entertainment, Inc (INSE) Misses Q4 EPS Estimates 8 hours ago DNTH Stock Jumps 21.5% Despite Wider-Than-Expected Q4 Loss as Pipeline Prospects Fuel Rally 8 hours ago SuRo Capital Corp (SSSS) Reports Wider Loss Q4 EPS Estimates by 10.0% 9 hours ago Tenax Therapeutics Inc (TENX) Reports Q4 Earnings 9 hours ago KVH Industries Inc (KVHI) Reports Q4 Earnings 7 hours ago Nio Inc (NIO) Beats Q4 EPS Estimates by a Wide Margin 7 hours ago Ultralife Corp (ULBI) Reports a net loss for Q4 FY25 7 hours ago Protara Therapeutics, Inc. (TARA) Reports Narrower Loss for Q4 7 hours ago Apyx Medical Corporation (APYX) Reports a Net Loss for Q4 FY25 7 hours ago Esperion Therapeutics, Inc (ESPR) Misses Q4 EPS Estimates 8 hours ago Inspired Entertainment, Inc (INSE) Misses Q4 EPS Estimates 8 hours ago DNTH Stock Jumps 21.5% Despite Wider-Than-Expected Q4 Loss as Pipeline Prospects Fuel Rally 8 hours ago SuRo Capital Corp (SSSS) Reports Wider Loss Q4 EPS Estimates by 10.0% 9 hours ago Tenax Therapeutics Inc (TENX) Reports Q4 Earnings 9 hours ago
ADVERTISEMENT
Earnings Transcript

Diamondback Energy, Inc Q4 2025 Earnings Call Transcript

$FANG February 24, 2026

Call Participants

Corporate Participants

Adam LawlisInvestor Relations

Kaes Van’t HofChief Executive Officer and Director

Jere ThompsonExecutive Vice President and Chief Financial Officer

Danny WessonExecutive Vice President and Chief Operating Officer

Al BarkmannExecutive Vice President and Chief Engineer

Analysts

Neil MehtaAnalyst

Gabrielle CernyAnalyst

Jeoffrey LambujonAnalyst

Phillip JungwirthAnalyst

Arun JayaramAnalyst

Bob BrackettAnalyst

John FreemanAnalyst

Derrick WhitfieldAnalyst

Kalei AkamineAnalyst

Kevin MacCurdyAnalyst

Doug LeggateAnalyst

Scott HanoldAnalyst

Leo MarianiAnalyst

Charles MeadeAnalyst

Paul ChengAnalyst

Advertisement

Diamondback Energy, Inc (NASDAQ: FANG) Q4 2025 Earnings Call dated Feb. 24, 2026

Presentation

Operator

Good day, and thank you for standing by. Welcome to the Diamondback Energy’s Fourth Quarter 2025 Conference Call. At this time, all participants are in a listen-only mode. After the speakers’ presentation, there will be a question-and-answer session. [Operator Instructions] Please be advised that today’s conference call is being recorded.

I would now like to hand the conference over to your first speaker today, Adam Lawlis. Please go ahead.

Adam LawlisInvestor Relations

Thank you, Corey. Good morning, and welcome to Diamondback Energy’s Fourth Quarter 2025 Conference Call.

During our call today, we will reference an updated investor presentation and letter to stockholders, which can be found on Diamondback’s website. Representing Diamondback today are Kaes Van’t Hof, CEO; Danny Wesson, COO; Jere Thompson, CFO; and Al Barkmann, Chief Engineer.

During this conference call, the participants may make certain forward-looking statements relating to the Company’s financial condition, results of operations, plans, objectives, future performance, and businesses. We caution you that actual results could differ materially from those that are indicated in these forward-looking statements due to a variety of factors. Information concerning these factors can be found in the Company’s filings with the SEC. In addition, we will make reference to certain non-GAAP measures. The reconciliations with the appropriate GAAP measures can be found in our earnings release issued yesterday afternoon.

I’ll now turn the call over to Kaes.

Kaes Van’t HofChief Executive Officer and Director

Thanks, Adam. Welcome everyone, to the fourth quarter earnings call. As usual, we will open up the line for questions. Hope everybody read the letter last night. A lot of good detail in there, and we look forward to discussing. So, operator, please open the line for questions.

Question & Answers

Operator

Thank you. At this time, we will conduct a question-and-answer session. [Operator Instructions] Our first question comes from Neil Mehta of Goldman Sachs. Neil, your line is open.

Neil Mehta

Yeah, good morning, Kaes and team. Thank you for jumping right into it. No surprise that the area we want to dig into here is the Barnett, Kaes. And just talk about what you think the opportunity set is. You are deploying more capital here in 2026. How you think about the potential returns associated with it and just the mix as well between oil and gas?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, Neil, I’ll give you some high-level thoughts and then turn it over to Al. It’s a pretty exciting reveal of our position in the Barnett. That’s a position that was essentially almost zero acres a couple of years ago. We were able to grow that position without cap raises or press releases or buying the next private equity-backed entity.

I think overall being able to build a position in our backyard that we understand very, very well is going to be very good for our shareholders long-term and good for corporate returns long-term. We’re not having to pay $3 million, $4 million, $5 million, $6 million a stick to build this position. And that’s a testament to the team having belief in the rock. Now that we’ve put the drill bit in the rock, we found that the returns look very good from a productivity standpoint.

The next step is we have to get the cost down. We haven’t really moved to full field development. That’s going to start here in the second half of 2026 in earnest and pick up in the coming years. So, I think it’s a good time for us to reveal what we have. We’re not done yet, but wanted to show our investors what we’ve been up to. That resource expansion is an important part of our overall story. I’m going to turn it over to Al for some details and what he’s found from a technical perspective.

Jere Thompson — Executive Vice President and Chief Financial Officer

Yeah, Neil, I think if you look at Slide 12 here in the deck, you can see we have shown the performance of our 2025 Barnett plan here relative to our core development plan. I think the performance really stands out and speaks for itself. I think when we are able to get the cost down, 20%, kind of from where we are with our delineation wells here, we think these returns are going to be competitive. So, we are pretty excited about the potential here, 900 gross locations and I think we will be allocating capital to the plan more going forward.

Neil Mehta

Yeah, that is a good follow-up, which is just talk about the product mix here. On Slide 12, you show that there is more gas that comes out of the Barnett, but actually there is potentially more oil as well. It is probably a little oilier than some of us would have thought. Just talk about how you are thinking about making sure that you are maximizing the liquids cut out of these barrels.

Jere Thompson — Executive Vice President and Chief Financial Officer

Yeah, I think just looking at the absolute oil production, you can see that is even differential, right? That is what we have got in the plot. The initial GORs are higher, right? So, kind of in the 3,000 range. I think kind of what is striking when you compare the six-month cume oil and BOEs to the 12 month, kind of see a flatter GOR profile, right, through the year, especially relative to the core. So, the GOR profile in the core zones kind of ramps up a little faster, and we are seeing a much flatter GOR profile through the 12-month period.

So, where core zones like 80% oil, for that first six months, it goes down to about 75% oil. The Barnett plan that we are showing here is set 67%, basically flat for the first 12 months. So, a little different profile on the product mix, but overall, I think the oil productivity speaks for itself and is very competitive once we get the returns where we see them going.

Danny Wesson — Executive Vice President and Chief Operating Officer

Yeah, Neil, one thing I would add is, whether the timing is planned or not, we do have a Permian Basin that is going to have a lot of gas takeaway coming on in the 2027-2030 timeframe. We are going to have to drill a lot of Barnett wells over that time period. The Barnett is a different type of lease. It is not held by vertical production or production in the core zone. So, we got a lot of drilling to do, but getting a good price for our gas and our liquids is going to be a benefit to returns in the 2027-plus timeframe.

Neil Mehta

All right. Thanks, Kaes. Thanks, Danny.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Neil.

Operator

Thank you very much. Our next call comes from the line of Gabrielle Cerny of William Blair Equity Research. Gabrielle, your line is open.

Gabrielle Cerny

Hey, Kaes, it’s [Phonetics] Neil.

Kaes Van’t Hof — Chief Executive Officer and Director

Hey, Gabrielle.

Gabrielle Cerny

Hey, sticking with the Barnett, can you talk about the well economics there versus the Midland Basin? I guess what I’m getting at is, I’m looking at Slide 12, it shows that your Barnett wells, you’re talking about kind of a 36 MBOE per 1,000 foot, 12-month cume versus 22 for the core Midland, yet, you talked about maybe that $100 per lateral foot Barnett versus what are you down to, I think $5.50 [Phonetics] for the Midland cost. So, curious how you’re thinking about total returns, Barnett versus the Midland average.

Kaes Van’t Hof — Chief Executive Officer and Director

Why do not I hit the high level and let Danny talk about how we are going to get the cost down. We — high level, our core Midland development, which I would put as everything except the Wolfcamp D is close to about $5.10, $5.20 [Phonetics] a foot. If we can get — and the Barnett today is at $1,000 a foot. If we can get the Barnett down to $800 a foot, and the Barnett oil production is 60% better on a first year cume than the core, then the returns start to get competitive. And I think we are fortunate that the rock has been proven first, and then the costs will need to come down. But Danny has a few examples of how we are going to do that.

Danny Wesson — Executive Vice President and Chief Operating Officer

Yeah, I mean, I think a lot of the cost reductions we are targeting are really just a decision to move to kind of development mode and apply the techniques we have learned over the years, developing what we call the Midland core, with multi-pad development — multi-well pad development, simul-frac. And those things are really just a decision to go to that full-scale development and see those cost savings accrue to the Barnett development as well.

On the drilling side, we have been pretty conservative in the drilling plan we have laid out in the delineation wells, really just targeting successful wellbores. We have a lot of things we think we can apply in the drilling plans that we can cut a lot of cost out of the drilling part of the well. And also we think the Barnett — the leasehold we have established in the Barnett sets itself up well for extended lateral development. So, we are kind of targeting 15,000 foot laterals in the Barnett. It won’t be everywhere, but we hope the majority of the wells that we drill in that zone will be extended laterals, 15,000 foot — plus foot, which will also help drive down that per foot cost.

Gabrielle Cerny

Great. Good details. And then just secondly, Kaes, my second is on inventory. By the way, thanks for disclosing. I do not think versus any other companies have this kind of similar details around that. But I am wondering, could you just address, maybe, talk about inventory replenishment and reinvestment in your existing asset base? It appears when you add the Barnett to your total drilled feet year-over-year, only decreased minimally. So, I am just wondering how you are thinking about inventory replenishment and reinvesting going forward.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I mean, listen, we are in a depleting business, right? And we think about inventory every day. Diamondback was a company that went public with very little inventory and had to work for every stick that we added over the last 15 years. So, something that is top of mind for me, for the team. If you look at the inventory disclosure we put out, the team did a very good job increasing our average lateral lengths last year, up by about 600 lateral feet on average, which is — that’s a big number on a big company. I think we are going to continue to try to add inventory where we can.

If you notice, like I said earlier, all this inventory was added and put in the plan without needing outside capital or press releases, all while still returning a ton of cash back to shareholders. So, I think you should expect that to continue. I think we kind of have a philosophy here that no deal on inventory in the Midland Basin should leave Midland or leave Diamondback without us taking a look at it. So, we are highly focused on continuing to replenish our inventory. We recognize that it is not infinite, but I think we have a plan to continue to grow it.

Gabrielle Cerny

Perfect. Thanks, buddy [Phonetics].

Operator

Thank you very much. Our next call comes from the line of Jeoffrey Lambujon, Jeff of TPH and Co. Jeoffrey, your line is open.

Jeoffrey Lambujon

Good morning, Kaes and team, and thanks for taking my questions. My first one means to hit on the implications from some of the Barnett disclosure while also still keeping in mind legacy Midland core operations. We took note of the strong oil cumes from both data sets in the slide, as you guys have spoken to already, and obviously, the productivity for the Barnett looks strong as well on an absolute basis. As you think about that, we were hoping you could speak to your outlook for corporate oil mix over time as you continue to develop your Midland Basin core inventory and work in more Barnett/Woodford over time as well.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, it is funny, Jeff. We have a $3.75 billion budget, and $150 is allocated to the Barnett, but it is getting all the airtime. But that’s the market we live in. I think that means that investors trust the inventory that we have in the core, and they trust that we have enough of it. But at the end of the day, what the teams are doing on the core inventory, the vast majority of our budget is very, very impressive. Lateral lengths, up year-over-year; productivity, in a world where productivity is being questioned on a per-foot basis.

In many basins, the team was able to increase productivity in 2025 versus 2024 on the oil side. That just means we are continuing to test things in terms of stage lengths, stage designs, where we are putting the drill bit, spacing, all the zones that we are developing. And the results kind of speak for themselves. I think generally, with the Barnett becoming a bigger piece of the capital pie, oil mix will go down over time, which is why we have tried to focus more and more on our gas marketing strategy and getting better realizations on that front, because I think it can really help overall free cash and corporate returns after these pipes come on in the back half of 2026.

Jeoffrey Lambujon

Perfect. That is very helpful. And for my second question, I actually wanted to revisit something that is also not yet factored super meaningfully into guidance, at least for now, but is also exciting to think about, which is the hyperscaler and data center opportunity you have spoken to in past quarters and on past calls, and how Diamondback really offers the full suite of what a counterparty there would be looking for in terms of the surface acreage over last year, the water supply potential, especially thinking about Deep Blue, and of course, gas or power from the upstream business. I wonder if we could just get a refresh on how discussions are progressing there and how you are thinking about those opportunities in general.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, Jere, take that one.

Jere Thompson — Executive Vice President and Chief Financial Officer

Yeah. Morning, Jeff. You are exactly right. I mean, we continue to be excited about the opportunity as we feel we have all the pieces for a very compelling project. And we are making progress on bringing data centers onto our surface position. I think as you think about Diamondback specifically, the biggest benefit here is our ability to structure a power purchase agreement that provides for material uplift to nat gas pricing. So, just another creative tool in the toolbox for us as we are thinking about improving natural gas realizations, which we obviously highlighted in the deck and Kaes alluded to earlier. So, a new meaningful in-basin and egress solution for us. So, we continue to make progress. We are excited about the opportunity, and when we have more to discuss publicly, we will definitely do so.

Kaes Van’t Hof — Chief Executive Officer and Director

I would say the only thing I would add there, Jeff, is we are not going to announce anything until it is completely binding, and we can talk to our investors about what it means for them. There has been a lot of noise in this space. I still continue to believe, given our size and scale and expertise in the basin, we offer the full package, and conversations have improved. But we are not going to talk about it in detail until we have those details. But a great question.

Jeoffrey Lambujon

Perfect. Appreciate that.

Operator

Thank you. Our next call comes from the line of Phillip Jungwirth from BMO. Phillip, your line is open.

Phillip Jungwirth

Yeah, thanks. I will also give the Barnett more airtime here. Appreciate you bringing resource expansion back to the E&P sector. So, the Midland Basin, it is obviously a large area. Was just hoping you could talk about how you see Barnett variability across either your or other operator wells, across the northwestern side of the basin versus Southeast. And why do you think your Barnett well productivity has outperformed the industry to such an extent?

Al Barkmann — Executive Vice President and Chief Engineer

Yeah, I think the big distinction that we kind of see when you look at the map on Slide 12 here, the wells that are to the Western side of the basin and actually up on the Central Basin Platform, which is really where the play began back in kind of the late 2018s [Phonetics] that has lower maturity, so more within the oil window. But that comes along with lower bottom hole pressures. And — so what we have seen in terms of 30-day IPs and six-month cumes is the well performance in that area where the play kind of kicked off is not as strong and robust as when you kind of move down into the basin and you have got higher bottom hole pressures, and you have got more gas in the system, so you are getting higher initial rates.

And yeah, I think the variability in GOR, we’re still kind of delineating around the basin, especially as you move to the East and to the South. And so there is going to be variability in GOR. But I think one of the things that we really focused on from a technical standpoint is where can we find the best resource, the thickest resource, and then the potential to drain potentially the Barnett and the Woodford reservoirs with a single wellbore. And we believe we have put together a really strong position in the best resource quality within the basin.

Phillip Jungwirth

That is great. And then you called out Diamondback having nearly two decades of inventory at its 2026 pace. Last year, there was a lot of talk about peak Permian, who has inventory to grow, who does not. For Diamondback, assuming a green light scenario, just how do you think about a sustainable growth rate that can be achieved for the Company over a multiyear period, given the depth of resource you have?

Al Barkmann — Executive Vice President and Chief Engineer

Yeah, I mean, listen, I think that is highly dependent on the macro. But in general, it feels like investors over time want some form of growth. We have done it on a per-share basis for the last few years. At some point, organic growth is going to come into the equation. Unfortunately, we are still stuck in this yellow light, in this stoplight analogy that we cannot shake yet. But I think there is probably a world where if we can efficiently allocate capital and growth becomes kind of the output, that is probably a good decision.

I think, for 2026, we are starting the year here still in this kind of quasi-yellow light, where oil production is the input, and then capex will be reduced if things go well and then held steady if things go as planned. But there could be a world where we hold capex flat and see what growth comes out of it. That day is not today, but there will be a time, and that is why every day we think about inventory, inventory duration, inventory growth, and things like the Barnett, which is getting a lot of airtime today, are accretive to that long-term duration story.

Phillip Jungwirth

Thanks, guys.

Kaes Van’t Hof — Chief Executive Officer and Director

Thank you.

Operator

Thank you very much. Our next question comes from the line of Arun Jayaram from J.P. Morgan Securities. Arun, your line is open.

Arun Jayaram

Good morning, gentlemen. I also have a follow-up on the Barnett. Yeah, just to follow up on the Barnett. Looking at the 12-month cum plot on Slide 12, it looks like the average well is delivering just under 50% more oil cuts or mix over the first 12 months of the well. I just wanted to see if you could comment on your thoughts on what the Barnett would do for your oil in terms of oil growth over time because that has been just a question we have been getting, just because there is a little bit higher gas you are getting, but the oil cut is higher than that. And if we could maybe translate that into an oil EUR for an average well based on your tests so far.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I will let Al give the EUR commentary. I think the one thing I would say, if you start to run these wells at $800 a foot or close to it, the rate of return relative to the base plan looks very comparable, but the PV is significantly larger. So, we look at both of those things, PV and rate of return, and try to find a nice balance there. The key here is getting these costs down. It makes the returns competitive, particularly in areas with Viper minerals, but then the PV impact is huge. From an NAV perspective, that is very positive. Now, I will turn it over to Al for some type curve commentary.

Al Barkmann — Executive Vice President and Chief Engineer

Yeah, Arun, that 50% uplift that you kind of see at the 12-month timeframe, that roughly equates to the uplift that we see relative to the core zones on a EUR basis. So, you think about our core zones, those are about 50 BO a foot in the Midland Basin. Right now, in the Barnett, we think we are pretty close to about 75 BO a foot for the ultimate recovery for those wells.

Arun Jayaram

That is helpful, Al. Just on my follow-up, I was wondering, Kaes, in your shareholder letter, you mentioned how the company was testing for surfactants. And just give us a sense of how those pilot projects are going? Are you using surfactants in terms of your base production management? Are you testing those in terms of new completion activities? But give us a sense of what you are seeing thus far and how you are using those in terms of your development scheme?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, it’s early in the surfactant game, but it is exciting. We did a 60-well test in the second half of last year. Credit to the team to mobilize that quickly. This went from an idea in June to execution by December, and we got a lot of data coming in from those tests. We focused on the production side for now so that we can try to figure out which variables are working. I do think there has been some discussion about adding this to the front end on your completion. I think we are going to test that, but we are also going to continue to test the production side of the business.

And from a high-level perspective, in my mind, this was something that no one talked about outside of papers, SPE papers four or five years ago, and now it is becoming something that can potentially be economic. And I think that is why we put in our last shareholder letter, never underestimate the American engineer, because there is still a lot of oil in the ground in the Midland Basin and in the Permian Basin that needs to be extracted. It just needs to be extracted economically, and that is what we are working on today. So, Al, you wanna talk about the tests?

Al Barkmann — Executive Vice President and Chief Engineer

Yeah. So, like Kaes was saying, we trialed 60 treatments in the back half of 2025. A lot of lab work and technical work going into designing the surfactant for the specific rock types and the specific surfactant types that we are using. It is pretty early on in the results, but we have seen at least in a handful of the DSU that we have applied this to some really exciting results. So, the team is taking that information and going back, refining the chemical makeup there and the design of the test, and really trying to hone in on the variables that are driving the performance for the program.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I think this is all gravy, right? This is all added production, added reserves to something that we did not think was possible a few years ago. And I would say this is v1.0, Arun, right? This is what Wolfcamp B fracs looked like in 2014. So, I think we got — you look how far we have come in 10 years, and again, this is a highly technical organization that is going to work to figure some of this stuff out.

Arun Jayaram

Great. Thanks, Kaes and team.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Arun.

Operator

Thank you. Our next question comes from the line of Bob Brackett from Bernstein Research. Bob, your line is open.

Bob Brackett

Good morning. And I am going have to go back to the Barnett, just because it seems to be the flavor of the day. If I compare your typical well, it is less than $600 a foot. You have got a path for the Barnett to get from $1,000 a foot to $800 a foot. The top of the Wolfcamp versus the top of the Barnett are a couple thousand feet apart, so not a whole lot of vertical depth. What is stymieing the drilling down there? Is it on the completion side, where those incremental costs are coming from? What are some potential solutions?

Danny Wesson — Executive Vice President and Chief Operating Officer

Yeah. Hey, Bob, thanks for asking. It is really just a different resource altogether, and we have got to set up a drilling program that is a little bit different than what we do in the Midland Basin core. The Barnett, we are using oil-based mud. There is an extra string of pipe in the vertical portion of the hole. And all that we have been doing, as I alluded to earlier, to de-risk any kind of operational issue as we were delineating this play.

I expect we are going to continue to be a little bit more conservative as we roll into development mode on the drilling side, but we will start doing things that we know through calculated risks we can do to cut costs out of those wellbores. And on the completion side, too, there are some additional costs there. The jobs are a little bigger. We are targeting four wells a section in the Barnett, so we are pumping larger jobs to try and generate a larger simulated rock volume across those four wells. And we have been only doing one or two well pads, so a lot of single well or zipper fracs. And as we move into development, we are gonna move into full scale four-well-pad development or eight-well-pad development on the Barnett and utilize silo frac, continuous pumping, the things that we have learned from our development in the Midland Basin core over the years.

Bob Brackett

That is all very clear. Quick follow-up, if I could. One of your peers talked last week about international opportunities. I am curious, where do international opportunities sit on your list of strategic priorities?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, Bob, I mean, it is certainly low from a strategic perspective. I would say a company of our size should start to understand what else is out there around the world, and really for the main reason of what else around the world could push us out on the global cost curve. And we have spent a lot of time studying that. Obviously, there are different dynamics above ground and below ground around the world. And I think what that has taught us is we have a very, very good long-duration inventory in the Permian Basin.

And now there are things like the Barnett and surfactants and all that kind of stuff that we are going to be talking about a lot over the next three to five years. That just kind of points me back towards staying home. The Permian Basin has been very good to Diamondback, growing our position here. We are basin experts. And there may be good rock around the world, but there are a lot of other issues that come with that rock. So, we have learned a lot about what is out there, but there is not a lot of action that we are focused on today.

Bob Brackett

Very clear. Thanks.

Operator

Thank you. Our next question comes from the line of John Freeman of Raymond James. John, your line is open.

John Freeman

Good morning. Thank you. You all had a really nice improvement in your leading edge completed feet per day at 4,500. Just maybe some thoughts on what is sort of embedded in the ’26 plan and just where you all see that potentially getting to by year-end?

Danny Wesson — Executive Vice President and Chief Operating Officer

Hey, John, thanks for asking. Yeah, I mean, the core program still continues to really shine, and Kaes put some commentary in his shareholder letter around some of the continued efficiency improvement we are seeing on the drilling side and the completion side. On the completion side, the team has been working on implementing what they call continuous pumping across all of our simul-frac e-fleets. Really what that means is we just do not shut down between swapping wells in the simul-frac pad. And we have been averaging 4,500-ish feet a day on those continuous pumping fleets, but we have seen some results of above 5,500 feet per day.

So, we are encouraged by that. We think we still have opportunities to reduce our cycle times this year. If that comes to reality, we are going to be able to get rid of some frac crews and be able to hopefully complete fewer wells in the year to achieve our production targets.

Kaes Van’t Hof — Chief Executive Officer and Director

I think one thing I would add, John, that we are kind of finding out, we are really starting to test different stage lengths, stage designs, frac designs, and what continuous pumping does is it removes the biggest piece of non-productive time to swapping between your stages. So, we are going to test shorter stages. We are able to do that with less cost. All these things are little wins that accrue to our shareholders. And you think, hey, continuous pumping is one thing to do more lateral feet, but what are all the other tangential benefits that are now starting to show their face? That is what is exciting there too.

John Freeman

That is really helpful. And then just my follow-up: tariffs have been pretty topical of late. Have you all secured or maybe locked in the pricing on your steel-related products for the 2026 program?

Danny Wesson — Executive Vice President and Chief Operating Officer

The way our procurement agreements work on the casing side of things, it is kind of a repricing quarterly. With the tariff ruling that was just announced last week, we are not sure how much impact that is going to have on the OCTG, because that flows through a different law as far as the tariffs go. But we reprice our casing every quarter based on an index price with our supplier.

And then on the tubular goods, we do procure those things out in longer lead times if we feel like we have got an opportunity to secure some at a beneficial price. We kind of watch that market and just make those decisions based on where we think the market is headed. But the tubing side of things has been pretty sticky even through the tariff world. Really, the inflation we have seen has been on the casing side of things. And unless we get some other tariff relief on, I think, it’s Section 232, then we do not think those tariff-related inflationary impacts are going to go away. We are just really waiting on or looking to see what activity does in North America to drive casing prices one way or the other.

John Freeman

Thanks, guys. I appreciate it.

Danny Wesson — Executive Vice President and Chief Operating Officer

Thanks, John.

Operator

Thank you very much. Our next question comes from the line of Derrick Whitfield of Texas Capital. Derrick, your line is open.

Derrick Whitfield

Thanks. Good morning, all, and congrats on a strong year-end.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Derrick.

Derrick Whitfield

I wanted to start with surfactants. From my understanding, the capital efficiency on using surfactants in your workovers is quite exceptional. Could you perhaps elaborate on the degree of uplift you are seeing in production on average for dollars spent? And separately, on the new well side, understanding you guys are very early in the process, but maybe could you speak about it from the data you are seeing from Viper that would suggest that you are seeing an uplift in the EURs [Phonetics] on new wells?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I do not know if we are seeing enough yet at Viper to make that distinction. We do not have all of the private data on designs and what got pumped. But I think if we start to see overall productivity improvements from peers, we spend a lot of time trying to study that and say what can we do better. The thing I would say about our surfactant tests, tested 60 wells, they are fairly cheap jobs, about $0.5 million, and I think we can work those down. What we did was we did the jobs when we had to pull the ESP anyway.

So, you are having to — you have some sunk costs, and then you just pump some surfactant and water. And listen, we do not even know how much of the wellbore we are touching today, but some of the results are significant. Some of the multi-hundreds of barrels a day uplift from a well that is producing a couple hundred barrels a day. I would say on average we have seen about an average of about 100 barrels a day pop, which for $0.5 million is a high-returning project. I think we have got to get smarter on it. We are gonna keep testing it. I think over time, as we refine that analysis, it is going to become a part of our overall development plan and life cycle of these wells. So, that is how I see it today. I look forward to all of the advancements that the teams are going to make. We have made a lot in a short period of time. There is going to be a lot to come in the next couple of years.

Derrick Whitfield

Great. And maybe staying on the resource expansion theme, but giving you guys a breather on the Midland Basin side, there has been a lot of buzz from industry on both the Barnett and Woodford in the Delaware. While I realize that EOG is chasing a different Woodford concept in Pecos, I would love your take on the view of that interval and your position over in Pecos.

Kaes Van’t Hof — Chief Executive Officer and Director

I think generally we have been following it. It is going to be more expensive than the Midland Basin Barnett, even. I kind of equate the Midland Basin Barnett to kind of core Delaware-type costs and this is below that. There have been people poking around Barnett and Woodford in the Delaware now for seven or eight years. I don’t think we are ready to begin a big program in the Delaware on our position. With the Viper map being as consolidated as it is on the Delaware side, we are going to learn a lot about it as people try to test it.

Derrick Whitfield

Great update. Thanks for your time.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Derrick.

Operator

Thank you very much. Our next question comes from the line of Kalei Akamine from Bank of America. Kalei, your line is open.

Kalei Akamine

Hey, good morning, guys.

Kaes Van’t Hof — Chief Executive Officer and Director

Hey, Kalei.

Kalei Akamine

With respect to the ’26 guide here, the disclosures have been simplified. Just kind of wondering if you can talk about the number of targeted drills and fills expected this year, the DUC backlog that supports that program, and then what kind of conservatism has been baked into the volume, noting that surfactants and Barnett are kind of new efforts here contributing?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, listen, we try to simplify our disclosure to just say, here is the amount of lateral feet we completed or plan to complete. If we do better than midpoint, or towards the low end, that means we have high capital efficiency. So, I think our transparency and disclosure is still best in class. We certainly have a solid DUC backlog that we can push or pull on, depending on the macro. But I think that is going to be a management decision. Right now, the base case is just kind of hold it flat.

One thing I will say about the 2026 capex guide, we are kind of guiding towards the lower end of that quarterly average in the first quarter, and I think we expect the same to be for the second quarter. As we get to the back half of the year, I think some of these things that we are talking about a lot today, the Barnett, surfactants, Barnett well costs, if those things start to trend our direction, then I think there is a world where capex comes down this year. That is just not something I think, given our history of conservatism, we want to put out as fact today. So, I think there are some goals to be set for the teams, and we are already well on our way to achieving them, but I just don’t think they are going to run through guidance yet.

Kalei Akamine

I guess the follow-up there is just on the number of drills contemplated. And then the second question is just on the working interest in the Barnett, 64% is the lowest in your stack. Wondering if you could talk about any opportunities to increase that interest, whether that is organic leasing or maybe it is inorganic, understanding that the rights could be in somebody else’s hands, and whether that could be achieved via acreage swap, which contributed very meaningfully to this inventory update?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I mean, on the working interest side, we are always looking to increase working interest. We have built this position through a few partnerships where our working interest is lower than it traditionally has been, but that does not mean there are not opportunities to grow it. So, I mean, the position had to be built organically, and that means usually after that is built, you start to work on swaps and trades and netting up and all, buying minerals and all the things that we do to add value around the base business.

On your second question, the model does not show us drawing or building a meaningful amount of DUCs this year. And I think we are still going to post how many wells we drill and complete every quarter. But if you think about last year, we ended up drilling more wells and completing fewer wells than we originally expected. And what the DUC discussion became a discussion that got more airplay than it deserved.

Kalei Akamine

That is very helpful. Thank you, Kaes.

Operator

Thank you very much. Our next question comes from the line of Kevin MacCurdy from Pickering Energy Partners. Kevin, your line is open.

Kevin MacCurdy

Hey, good morning. I guess for my first question, I will just hit on opex. We saw lower opex as a partial driver of the EBITDA beat in 4Q, but guidance — 2026 guidance is for a small increase for both LOE and GP&T. I wonder if you could address those. Is that just the water drop down on LOE and gas transportation contracts on GP&T, or is there anything else in there?

Kaes Van’t Hof — Chief Executive Officer and Director

That is most of it, Kevin. We sold the EDS system to Deep Blue in fourth quarter, so you saw LOE tick up a little bit. I think we have a couple things as headwinds this year on LOE. Power prices in the basin have gone up. So, we have got some power that is now unhedged. That is going to be priced at a higher number. That is probably a dime or two of hurt. And then we are continuing to spend more and more dollars on workovers, plugging and abandoning vertical wells, making sure our asset base is in good condition on that front. So, those are the couple of headwinds. On the GPT side, most of that is your traditional escalators on CPI, but also more molecules being taken in kind, so you are shifting dollars from realizations to GPT.

Kevin MacCurdy

Great. And maybe to ask one more clarification question on the Barnett. Will there be a separate rig dedicated to that program? And just to confirm, will those wells be geographically separate from your cube development?

Kaes Van’t Hof — Chief Executive Officer and Director

It really just depends. I mean, there will be separate rig lines that we have dedicated to the Barnett. I think it probably makes sense that those rigs just focus on that type of development. There are areas like Spanish Trail, where we have 100% of the minerals and high working interest that we are going to be in the same area as our shallow development. Then there are areas where we do not have it. I think overall, though, we are going to continue to build a position and try to share facilities wherever we can, because that is the most efficient form of capital use.

Danny Wesson — Executive Vice President and Chief Operating Officer

Yeah, I will just add. I think with the Barnett’s depth and with some of the mud properties and such that we will be utilizing to drill those wells, it will probably be a different rig package that we are looking at. Those rigs can certainly drill the Midland Basin core, but probably looking at a little bit upgraded rig package for those wells. So, ideally, we will have them all on separate rig lines that we may mix in some of our Midland Basin core with. But if we can get days down on the Barnett drilling, we will mix in more of our core development and probably have less Barnett-directed rigs in particular at the end of the year.

Kevin MacCurdy

Appreciate it. Thanks, guys.

Danny Wesson — Executive Vice President and Chief Operating Officer

Thanks, Kevin.

Operator

Thank you very much. Our next call comes from the line of Doug Leggate from Wolfe Research. Doug, your line is open.

Doug Leggate

Good morning, guys. I wonder if I could follow up on the last question about the mix of Barnett versus the base business. It seems there is obviously an HBP requirement here, given the relatively new acreage. And I guess the core of my question is, the type curve you have shown for the Barnett is presumably a parent well versus a development type curve for the cube development elsewhere. So, how do you expect that development-type curve to evolve relative to the base business?

Kaes Van’t Hof — Chief Executive Officer and Director

I think we will see, Doug. I think we are spacing these wells pretty wide. We have done a few two-well pairs, and we will still see what a full section development looks like. But I think, in general, the size of the job and the spacing that we are assuming should result in pretty consistent performance. Listen, I am not going to tell you that every well has been the best well we have ever drilled, but there are a couple in that data set that are probably the highest six-month cumes we have ever had at Diamondback. So, I think we are putting the bet on ourselves to continue to improve results and get costs down, and that is a good bet.

Doug Leggate

Obviously, it is early days, but thanks for the color. My follow-up is on the inventory question. I know there is no precision here, I want to understand what your intention is in talking about 20 years. Is that a kind of consistent, weighted average well quality? Is it maintaining production mix? Or more importantly, is it maintaining free cash flow? How would you want us to interpret that 20-year comment?

Kaes Van’t Hof — Chief Executive Officer and Director

Listen, I think not all inventory is created equal, right? The best — if we are doing our job right, we are drilling the best stuff first. And I think you see that throughout the space where productivity per foot, which is how we look at it, is starting to degrade depending on the company. And our job is to have the best productivity per foot, the longest. And you have seen us add in zones like the Upper Spraberry, like the Wolfcamp D, even five years ago, the Middle Spraberry and Jo Mill, and you have not seen significant degradation. In fact, 2025 results were above 2024.

So, in a world of decreasing productivity, our ability to maintain that productivity consistently and longer is, I think, a winning proposition. So, certainly, as you get further down our inventory, we are going to have lower productivity. I would be lying to you if I said otherwise. But the teams continue to work on ways to reduce costs, drill better wells, better frac jobs, get better well performance out of areas that we thought were tier two, tier three, three, four, five years ago. So, in general, it is about drilling the best stuff first and maintaining that sustaining free cash flow that you would like to talk about. And I think we can do it longer than anybody.

Doug Leggate

Great. Thanks, Kaes. I appreciate the answers.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Doug.

Operator

Thank you. Our next question comes from the line of Scott Hanold of RBC Capital Markets. Scott, your line is open.

Scott Hanold

Yeah, thanks. Kaes, if you can give some color and context on your view of Diamondback’s position in the industry going forward. I mean, historically, you all have built your position through successful M&A, and obviously, it feels like this quarter there has been a little bit of a shift to more resource expansion organically. Can you just give us a sense of like what you are seeing in the landscape that sort of drives the shift from where Diamondback historically had been?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I mean, Scott, there is no doubt that there has been a ton of consolidation, both in the Permian and elsewhere around the US. It has been top of mind. Your website, the RBC website, continues to shrink in terms of the number of tickers. I think generally there, things have moved towards basin champions. In the Permian, there are going to be independent basin champions like Diamondback. There are going to be mineral champions like Viper, and there are going to be surface champions like some of the other companies out there.

That natural consolidation has led us to say, we have a ton of acreage and a ton of resource. We should probably start to spend some more dollars improving that existing resource. So, we are not out of the M&A game, but as we said in the letter, the opportunities are fewer and further between, and therefore we are going to be doing more things like the Barnett, more things like testing surfactants. But don’t get it wrong, there is not a deal that happens in the basin without us knowing about it. It is just that there are not 10, 20, 30 deals left to do.

Scott Hanold

Thanks for that. And my follow-up is on your reserve report. You all mentioned there were some revisions to some of the numbers in there, and I know some of it is price related, but you did mention some performance-related revisions. Can you just give us a little bit of context behind that?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, I mean, the majority of the reserve revisions, and it is interesting that reserve reports are now becoming something people read again in detail, the majority of our revisions are due to price. The rest of the majority of our revisions are due to what we call pod downgrades, but it really just means we are bringing in wells that we acquired or pods that we acquired and bringing those to the front of the development program.

In general, we try to keep a very low pod balance. We try to — the SEC rule is five years of development. In general, we are kind of averaging three years of development in what we put in our pods. And right now Diamondback, from a booking perspective, we are 70% PDP, 30% pods. And I think as we do big deals like Double Eagle last year or Endeavor the year before, some of our existing pods get taken out and new pods get put in. But from a performance perspective or PDP performance perspective, there have not been meaningful changes to the reserve report.

Scott Hanold

Okay, so the individual wells are still holding true. It is just a shift in the pods moving in. Is that right?

Kaes Van’t Hof — Chief Executive Officer and Director

That is right. Just moving your best wells that you have remaining up.

Scott Hanold

Thanks.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Scott.

Operator

Thank you. Our next call comes from Leo Mariani of ROTH. Leo, your line is open.

Leo Mariani

Hi, I wanted to just revisit the Barnett here quickly. Can you give us a rough sense of the number of wells that you guys are going to be drilling or completing here in 2026? And can you just talk about what you kind of need to do to hold that position, say, over the next five years? Is there going to be a meaningful step-up in activity in 2027, 2028?

Danny Wesson — Executive Vice President and Chief Operating Officer

Yeah, Leo, we expect that to ramp up kind of through the end of the year. Like Kaes mentioned before, we expect to kind of allocate some activity to the plan in the back half of the year. So, roughly, we are looking at drilling about 30 wells this year, popping probably closer to 10, and then that ramps up significantly in 2027, where on a growth basis, we are probably looking at more like 100 wells for that program.

Leo Mariani

Got it. Okay. Is that the type of pace that would kind of hold everything together over the next couple of years? Just any color you can provide around lease terms or anything like that [Indecipherable]?

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, that is a general pace so that we can do it in a capital-efficient manner.

Leo Mariani

Okay, appreciate that. And then on continuous pumping, obviously, you talked about that. I think you’re kind of increasing, the amount of activity moving in that direction. You mentioned potentially being able to drop crews, at some point, down the road. Do you see that as a potential meaningful capital savings? If you can, get to the point where you are dropping crews at some point, say, later this year or next year?

Danny Wesson — Executive Vice President and Chief Operating Officer

Yeah, I don’t think that it’s going to drive a ton of cost savings from our service providers. There’s additional equipment requirements to be able to do so. There’s a little bit of savings on some of the dumb iron, just the rentals that are out there as you increase cycle times. But the big benefit is really, as Kaes, kind of mentioned, is some of the stuff we can do to optimize the completion without it adding additional costs from the additional well swaps and that kind of thing. Also the increased cycle time — or sorry, the decreased cycle time, that impacts your water out frequency. And you’re able to bring wells forward in the plan, which is only maybe a one-time effect, but really the water-out frequency and the length of time that you’re watering out offset pads is a pretty huge benefit to the full year cycle time.

Leo Mariani

Okay, thank you.

Operator

Thank you very much. Our next question comes from the line of Charles Meade of Johnson Rice. Charles, your line is open.

Charles Meade

Good morning, Kaes, to you and your team.

Kaes Van’t Hof — Chief Executive Officer and Director

Hey, Charles.

Charles Meade

I want to ask a question around nomenclature, because we’ve been talking about the Barnett here, and in your presentation, talking about the Barnett, but in your shareholder letter, you refer to it as the Barnett and the Woodford. And so I wonder if you could help me explore a bit how this play has evolved. If we go back to the late teens and when you guys had that, the Limelight prospect, that was pretty clearly a Barnett Mississippian target there. But it sounds like as you guys are going into the more the the basin center here, that it’s a Woodford and Barnett target, and it sounds like maybe you guys are landing in the Woodford and trying to frack up into the Barnett. I wonder if you could comment is that directionally correct? And more generally, elaborate on how the play has evolved for you guys.

Danny Wesson — Executive Vice President and Chief Operating Officer

I think that’s good commentary. So, the Barnett and Woodford are distinct reservoirs, right, and have their own distinct properties. The initial play, the Limelight play, when you think back to the 2017 timeframe, that was truly a Barnett play. There’s some nuance across the basin with the zone that divides the two reservoirs. The Mississippian lime sits between them. It changes in thickness pretty materially as you move across the basin, sort of north to south. So, up at the Limelight position, we had a pretty thick Mississippian lime section, and so those two reservoirs were separate and distinct. And then as you move kind of into some of the areas where we’ve been delineating more recently, the Mississippian lime is materially thinner, and we’re able to frack through it. But generally, we’re targeting the lower Barnett and able to drain the Woodford in some of these areas where you’ve got that thinner Mississippian lime section.

Charles Meade

Got it. That is helpful. And then, Kaes, this may be for you. If we go back to your stoplight metaphor. I think you — and I appreciate you really made it clear that you thought that the red light scenario seems like it’s receded a bit. I think the unspoken flip side of that is that the green light scenario is a little closer. But can you elaborate a little bit more on that? Does that mean that the green light scenario is closer than the red light, or is it closer than before, but you’re still on balance, more likely to slow down? Just you just fill out that metaphor.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, it’s a metaphor we can’t seem to shake, but, in general, I think it explains the situation pretty well. I just say, I think there were periods of time over the last six months where we were all much closer to the red light scenario in terms of crude price. There’s a lot of things impacting crude prices over the last few months. But, in general, I think, talking to our investors, they’re very supportive of this plan to keep production flat and maximize free cash and wait for the green light scenario.

And I think just generally, we’ve been talking about this oversupply for some people have been talking about it for two years and it just hasn’t seemed to happen as aggressively as some expected. I think as we turn to higher demand in the summer and driving season and trading the spring months in crude, people will start to find reasons to be less bearish. I could probably be wrong, but in general, we just feel more confident about the macro after a couple big shocks last year on the supply side and the demand side.

Charles Meade

Got it. It’s great color. Thanks, Kaes.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Charles.

Operator

Thank you. [Operator Instructions] Our next question comes from the line of Paul Cheng from Scotiabank. Paul, your line is open.

Paul Cheng

Hi, thank you. Gentlemen, two questions. One, in your D&C or well cost, now you’re already down in your legacy operation, say in Midland, $5.50 [Phonetics] or so. So, where’s the biggest opportunity to drive that down further? Is it coming from further improvement in drilling or completion? I mean, you’re already extremely efficient over there. That is going to allow you that to have better, maybe reduced downtime? Just give us some idea that where should we be seeing from there? That’s the first question.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, good question, Paul. I think on the drilling side, it’s — we’ve really been able to show quarter-over-quarter efficiency gains, and I think it’s just more of that. Getting more consistent in those ultra-fast wells, right? We talk about in the letter some wells that are sub six days, and we’re still averaging over eight days, spud to TD. How do we get that average from eight and half, nine days down to seven days? And that drives meaningful cost savings on the drilling side.

And then on the completion side, it’s — we’re continuing to go faster, and we talked a little bit earlier about continuous pumping and what that means for us. But it’s also working on the supply chain of the completion side. What can we do around fuel? What can we do around other supporting services to get more efficient and drive some of the dead costs out of that business? We’re working on a lot of those things every day. These are not big chunks of dollars, but it’s a lot of little things that add up to big chunks of dollars. We’re still grinding away on the core business. And like Diamondback’s always done, we’re not going to let up on that grind, and I’d expect to see more dollars flow out of the core business as we go throughout this year.

Paul Cheng

Do you think over the next several years, you will be able to more than offset the inflation and drive that $5.50 [Phonetics] number down, say, towards the 500 or 525 [Phonetics] in the next, say, three or four years?

Kaes Van’t Hof — Chief Executive Officer and Director

Well, the $5.50 [Phonetics] is a mix of all of our Midland Basin zones. That includes Wolfcamp D, some of the deeper stuff.

Jere Thompson — Executive Vice President and Chief Financial Officer

In Barnett.

Kaes Van’t Hof — Chief Executive Officer and Director

In Barnett. And so, yeah, I think certainly some of those deeper zones that are higher cost today, we’re going to see some material cost reductions in them as we continue to deploy our best-in-class execution prowess to those zones and learn about them more and put the bid on them more. Yeah, I do believe we’ll see the $5.50 [Phonetics] come down materially. Also in the, in the older stuff that we’re doing, the Spraberry, shallower Wolfcamp zones, I don’t know what inflation will do. It’s really going to be largely driven on activity. But our goal every day is to continue to work to execute better and more efficiently and drive costs out of our supply chain through what we consume. And then the variable costs, if we can execute better than everybody else, we’ll have better variable costs than everybody else, and that’s always been our focus and will continue to be our focus going forward.

Paul Cheng

Thank you. This second question is a quick one. I know the impairment charges on cash are price related, primarily, and also you have about 130 million barrel of the reserve revision due to the price. But $65 WTI last year is really not that low, so still a bit surprising you have reserve write-down and also impairment charge. Is it driven from the — or that is — is that all basically in the legacy Diamondback asset, or is from Endeavor or from Eagle — from Double Eagle? Thank you.

Kaes Van’t Hof — Chief Executive Officer and Director

Yeah, Paul. I mean, listen, fair value accounting is what it is. And fortunately for us, the Endeavor deal was very well received, and that deal was put on the books in September of 2024 at $80 oil and $4 Henry Hub. And I don’t think there’s an investor out there that would say, hey, that was a bad deal. So, unfortunately, when you put something on the books at $80 and then you average $64 for a year, the market says you have to — the accounting rules say you have to have a write-down. It’s unfortunate. But at the end of the day, I think I stand with all of our investors that we’re very excited and happy that we did the Endeavor deal. The accounting rules will be what they are.

Paul Cheng

Thank you.

Kaes Van’t Hof — Chief Executive Officer and Director

Thanks, Paul.

Operator

Thank you. At this time, I’m showing no further questions. I would like to turn it back to Kaes Van’t Hof for closing remarks.

Kaes Van’t Hof — Chief Executive Officer and Director

Well, despite the no prepared remarks and starting immediately, you guys all were able to ask 65 minutes worth of questions. We appreciate your interest, and thank you for the time today.

Operator

[Operator Closing Remarks]

Disclaimer: This transcript is provided for informational purposes only. While we strive for accuracy, we cannot guarantee that all information is complete or error-free. Please refer to the company's official SEC filings for authoritative information.